The improved mobile workshop solar wiring setup for both off grid and grid tie options



This is the wiring setup for the mobile workshop that is set up to function both off grid and in grid tie mode while parked. I rewired this so that the panel input comes in through a fuse block to protect some of the equipment against lightning strike or power surges and the two place fuse block allows me to determine whether or not to run the grid tie inverter instead of or with the regular charge controller. The 2KW modified sine wave inverter is not shown much in this video, but did not change from the other setup, except that I mounted the battery much closer to it and it now runs more equipment than it did when there was a longer cable between it and the battery.


Post time: Mar-30-2018